EUROGUSS | KNIGHT WENDLING GmbH
KNIGHT WENDLING GmbH of the EUROGUSS
default Company Image
Exhibitor

Hall 7 / Booth Number 7-600

KNIGHT WENDLING GmbH

Consulting

KNIGHT WENDLING GmbH, a sister company of GEMCO Engineers, is one of the leading consulting firms in the cast metals industry with special focus on the worldwide foundry industry

About us

south_east

Floor plan

south_east

Products

south_east

Articles

south_east

Sessions

south_east

Video

south_east

We offer

  • Factory and plant planning
  • System and component development
  • Process development and optimization
  • Production of casting prototypes
Show More

Industry

  • Mechanical and plant engineering
Show More

Contact Information

Arnheimer Straße 118
40489 Düsseldorf
Germany

About us

GEMCO, a family owned business for over 45 years, is dedicated to the cast metal industry, and provides expertise and know-how to help you and your operations advance now as well as in forthcoming markets and trends.

The Foundry Industry is driving efficiency, performance, and transformation, especially in terms of energy consumption and waste stream reduction. Rapidly changing circumstances and shorter product lifecycles, require flexibility and adaptability from the die casting industry, including the ability to introduce new product(s) quickly.

For any light metal casting process - HPDC, LPDC, GDC or individual steps in the process, such as melting, cooling, heat treatment, straightening and (pre-)machining, expertise is at hand within GEMCO. From process to product, design to simulation, analysis to solutions, and concept to turn-key realization.

... read more

Floor plan

Products

default Product Image
star_outline star

Consulting Services

Articles

Sessions

Watch our company video

grey background

Keywords

Assessments | of Foundry Facility | Process and/ or Product | New Product Introduction - from cell-layout to the launch of new product | Product Relocation – from Cell-to-Cell | within a casting facility or even to another facility | Productivity Upgrade | improve the production process: availability | productivity and quality (OEE) | scrap rate reduction | Project Management for Castability Design – from product to a castable piece | including design of all required tools | Project Management for Prototyping - Validation of a product design | not necessarily in the final production process