EUROGUSS | Engineering & Project Management

Hall 7 / Booth Number 7-600

Engineering & Project Management

Categories

  • Simulation service
  • Process development and optimization
  • System and component development
  • Factory and plant planning

Categories

  • Simulation service
  • Process development and optimization
  • System and component development
  • Factory and plant planning
Show More

Product information

For any light metal casting process - HPDC, LPDC, GDC or individual steps in the process, such as melting, cooling, heat treatment, straightening and (pre-)machining, expertise is at hand within GEMCO. From process to product, design to simulation, analysis to solutions, and concept to turn-key realization.

GEMCO offers services to the Die Casting Industry that encompass:

Project Management for:

  • Castability Design – Transformation of a product to a castable piece, including design of all required tools (die, grippers, etc.).
  • Prototyping - Validation of a product design, not necessarily in the final production process.
  • New Product Introduction - from cell-layout to the launch of new product
  • Product Relocation – from Cell-to-Cell, within a casting facility or even to another facility
  • Equipment Relocation / New Equipment Installation

Audit/Assessment of:

  • Foundry Facility,
  • Process and/ or Product

validation of a foundry's potential to produce to the requirements of the client

Benchmarking: Comparison of the foundry to others - based on a pre-defined set of KPIs (e.g. machine size, -capacity, flexibility, quality)

Productivity Upgrade: Improvement of the current production process in terms of availability, productivity and quality (OEE), scrap rate reduction

Interim Management:Operational Management – production, quality, logistics/stock control, maintenance, projects, health & safety, budget & finance

... read more